Bera 70 MW Peaking Power Plant at Bera (A bpdb project of Hyundai Heavy Industries Co Ltd.)
Scope of works:
- Erection and Commissioning of all capital machines & equipments like Engines, Pre-fabricated pipe modules, Boilers, Radiators, Silencers, Air filters etc.
- Fabrication and erection of HFO storage tank, HFO buffer tank, Diesel oil tank, Lube oil tanks.
- Fabrication & installation of pipe lines for different system, like Fuel oil system, Lube oil system, Steam & condensate system, De-mineralized & Raw water system.
- Fabrication and installation of duct lines for Charged air system, Exhaust system, Room ventilation system.
- Fabrication & installation of exhaust stacks, Chimney, Support structure & platforms.
- Acid & Chemical pickling all Pipe Line.
- Water & Lube Oil flashing all piping system