Baraka Patenga Power Limited (50MW power plant at patenga, Chittagong) Installation of steam turbine Co-generation system of 3.5MW as a Turnkey project.
Installation of Turbine, 8 Nos. boilers, Heat exchangers, Cooling towers, all related piping systems, fabrication of structure, platform at h....
Baraka Patenga Power Limited (50MW power plant at patenga, Chittagong) Installation of steam turbine Co-generation system of 3.5MW as a Turnkey project.
Installation of Turbine, 8 Nos. boilers, Heat exchangers, Cooling towers, all related piping systems, fabrication of structure, platform at high elevation.